Featured Projects

We design, manage and create solutions to complex challenges with precision and speed.

PakkaJacks

Project Challenge

To improve mining standards globally when considering suspended loads, craneage, downtime, safety and costs.

Solution

A radically improved approach to lifting, the unique patented auto-packing system that serves as lifts and stands and is fully supported. From replacing slew bearings to changing tyres, these units dramatically improve safety and speed of servicing and repairs in the mining industry.

PakkaJacks Animation – View Here

Spinner Targets – Defence Forces

Project Challenge

Design long lasting spinner targets for the defense industry.

Solution

As a Tier 1 Supplier to the defense industry, our executive team and development engineers designed, installed and commissioned heavy duty spinner targets for effective, onsite training exercises. The auto-resetting targets are durable and are designed to last.

Track Frame Change Out System

Project Challenge

How to create multiple, yet safe, work fronts in operation concurrently.

Solution

Designed and fabricated to extract track frames parallel to machinery whereby alignment is precise allowing for fast, easy removal and refit, enabling simultaneous engine change out, track frame work, undercarriage repairs – whilst providing massive benefits in worker safety.

Judges/Commentary Tower

Project Challenge

To create a state of the art tower to house technical equipment and provide views across a track facility, on a short time frame with minimal outlay.

Solution

A container tower structure incorporating an external staircase and all weather awnings for comfort. This high quality structure is functional, housing a track control office, commentors box and broadcasting/camera room.  A two toned colour scheme seamlessly blends with other infrastructure onsite.

Stemming Truck

Project Challenge

To modernize and rejuvenate the traditional way of stemming and blast preparation.

Solution

Designed with operator safety in mind – an increased bin capacity, updated control system, all electric drives and a rollerless conveyor have been developed to allow blast holes to be backfilled or “stemmed”, with greater accuracy, safety and efficiency. Our machines are revolutionising the stemming process in open cut mines, delivering substantial savings in materials, time and labour.

Military Training Camp Infrastructure

Project Challenge

To create in regional NSW, an enhanced, military training facility spanning a 3 month project timeframe.

Solution

To meet Defence Zone 2 standards at the Singleton Military Base, our executive team and development engineers project managed the design, fabrication and placement of 160 x 40 foot containers including fit out of stairwells, windows, handrails and creation of underground tunnels.